Metal Stud Framing
HomeServicesMetal Stud Framing
Precision layout

Metal Stud Framing

Interior partitions, radius walls, shafts and structural assemblies — plumb and square.

1/16"
layout tolerance
UL
listed assemblies
0
board goes up before framing walk
CSLB #1140425Licensed · Bonded · InsuredResidential & CommercialDrywall · Framing · CeilingsReconstruction After Water & Fire
Overview

The KTC approach to metal stud framing

Framing is where drywall quality begins. Our crews snap lines, layout doors, and set backing before board ever hits the wall — because a straight finish depends on straight steel.

We frame interior partitions, radius walls, curtain returns, shaft walls, chases and drywall soffits. Every job is coordinated with MEP so blocking and backing land where they need to.

Ideal for
Office layoutsMedical demising wallsHigh partitionsRadius design wallsCurtain wall returns
Our process

How a metal stud framing job runs.

Same rhythm on a 1,500 sq ft suite as on a full floor — because consistency is what protects the schedule.

01
Layout

Snap lines to the approved plan. Verify door swings, ADA clearances and demising alignments before track hits the deck.

02
Track & stud

Bottom and top track shot to structure. Studs plumbed, spaced and web-punched to accept MEP.

03
Blocking & backing

In-wall plywood and steel for TVs, monitors, grab bars, casework and mounted equipment — coordinated with the drawings.

04
Header & opening

Fire-rated headers over doors. Openings framed square for hollow-metal and wood-jamb sets.

05
Framing walk

GC / architect walk before board. Any adjustments captured and corrected same day.

What you get

Deliverables

  • Layout snapped and verified against approved plans
  • In-wall blocking for TVs, casework, grab bars and equipment
  • Coordinated openings for MEP rough-in
  • Framing walk sign-off before board hangs
Spec-grade

Materials

  • ClarkDietrich studs & track
  • MarinoWARE structural framing
  • Simpson Strong-Tie connectors
  • Plywood & LVL blocking
  • Fire-rated header assemblies
Schedule

Timeline

5,000 sq ft office floor: 5–8 working days framing complete, MEP-coordinated and ready for inspection.

Start a scope
Recent work

Selected metal stud framing projects

Full gallery
Metal Stud Framing project 1
Metal Stud Framing project 2
Metal Stud Framing project 3
FAQs

Questions we get on metal stud framing.

Don't see yours? Call (818) 515-9157.

Do you frame shaft walls and 2-hour assemblies?
+

Yes — CH studs, C-T studs and UL-listed shaft-wall systems. We build to the tested assembly, not a close-enough version.

Can you frame radius and curved walls?
+

Yes. Radius track bent on-site to the plan, studs spaced tighter for smooth board bend. Common in feature walls and reception areas.

Do you coordinate with the MEP subs?
+

Always. Blocking, chases and header openings are laid out with mechanical, electrical and plumbing so rough-in isn't a fight.

Request a walkthrough

Have a scope?
Let's price it.

Send plans, punch lists or reconstruction scopes — residential or commercial. We'll review the project and send back a detailed, line-itemed proposal.

(818) 515-9157khriz563@gmail.comLicensed · Bonded · Insured · CSLB #1140425
KTC commercial drywall crew installing precision walls on a project site